Deputy Speaker
Constituency No/Name: 05 - Mapusa
Date of Birth: | 12th November 1988 |
Email: | |
FAX: | -NA- |
Official: | 08322493330 |
Residence: | (0832)2262065 |
Personal: | 960423333 |
Office: | Office of the Deputy Speaker, Goa Legislative Assembly Complex, Porvorim-Goa,403521 |
Permanent: | 93/9 “Pentwyn” Kamat Gardens Dattawadi Mapusa Bardez Goa Pin Code:- 403507 |
Present: | -NA- |
Assembly | Constituency | Party | Votes Polled | Votes Received | Won By | ||||
---|---|---|---|---|---|---|---|---|---|
Seventh Legislative Assembly 2017 23 May 2019 to 12 Mar 2022 |
Mapusa |
Bharatiya Janata Party |
22451 |
11167 |
1151 |
||||
Fear and anxiety in the minds of the people regarding open water bodies like small lakes and ponds. The death of two kids from Mapusa due to drowning recently has brought this matter to fore. The steps the Government intends to take to prevent such accidents.
Thirteenth Session 2021
BUSINESS FOR THE DAY - 4
Ministers Reply 182.89 KB17A. *WILL the Minister for Public Works be pleased to state:
(a) furnish details of buildings which are vacant, partly occupied or in a dilapidated condition with details thereof;
(b) the plans of the Government to utilize these old buildings with details thereof;
(c) whether the Government is aware of the current condition of the SD IV, Works Division XIII office in Mapusa; and
(d) if so, the action taken by the Government; if not, reasons thereof?
SUB: STARRED LAQ NO. 017A TABLED BY SHRI. JOSHUA PETER DE SOUZA, REGARDING “BUILDINGS IN DILAPIDATED CONDITIONS” TO BE ANSWERED ON 22TH JULY 2022.
QUESTIONS | ANSWERS |
WILL the Minister for Public Works be pleased to state: | By Shri. Nilesh Cabral, Hon’ble Minister for PWD |
(a) furnish details of buildings which are vacant, partly occupied or in a dilapidated condition with details thereof; | Sir, As per enclosed Annexure. |
(b) the plans of the Government to utilize these old buildings with details thereof; | The Government is in the process of devising a mechanism to utilize these vacant buildings. |
(c) whether the Government is aware of the current condition of the SD IV, Works Division XIII office in Mapusa; and | Sir, Yes. The said office SD IV (WD XIII) is located in Tourism Department building at Mapusa& same is maintained by Tourism Department. However, we are in the process of shifting the said office to PWD premises in the next two months. |
(d) if so, the action taken by the Government; if not, reasons thereof? | The premises belong to Tourism Department . The maintenance of the office premises is being taken up with Tourism Department. |
Second Session 2022
BUSINESS FOR THE DAY -10
Public Works
Public Works Department
17B. *WILL the Minister for Public Works be pleased to state:
(a) whether the Government is aware of the rising demand for water in the State due to growth in Industry and trade, the influx of migrant population and the rise in local population; if so details thereof;
(b) whether the Government has conducted a survey of the number of existing commercial and domestic water connections/users; if so, details thereof;
(c) whether the Government seriously considers alternate sources of water such as rainwater harvesting, wastewater treatment and desalination, if so, details thereof; and
(d) the action taken by the Government to tackle the growing demand for water in the State; details thereof?
SUB: STARRED LAQ NO. 017B TABLED BY SHRI. JOSHUA PETER DE SOUZA, REGARDING “RISING DEMAND FOR WATER” TO BE ANSWERED ON 22TH JULY 2022.
QUESTIONS | ANSWERS |
WILL the Minister for Public Works be pleased to state: | By Shri. Nilesh Cabral, Hon’ble Minister for PWD |
(a) whether the Government is aware of the rising demand for water in the State due to growth in Industry and trade, the influx of migrant population and the rise in local population; if so details thereof; | Sir, yes and efforts are being made to meet the future demand through various water supply schemes.
|
(b) whether the Government has conducted a survey of the number of existing commercial and domestic water connections/users; if so, details thereof; | The details of domestic and non domestic consumers are as per Annexure I |
(c) whether the Government seriously considers alternate sources of water such as rainwater harvesting, wastewater treatment and desalination, if so, details thereof; and | The state is self sufficient with raw water for drinking purpose. As such there is no consideration for alternate sources of water. |
(d) the action taken by the Government to tackle the growing demand for water in the State; details thereof? | In order to meet the present shortfall and cater to the future demand various augmentations of water supply schemes, improvement of water supply position is proposed and the details are as per Annexure II. |
Second Session 2022
BUSINESS FOR THE DAY -10
Public Works
Public Works Department
61. WILL the Minister for Public Works be pleased to state:
(a) the details of total number of staff working under Sub-Div. IV Works Div XIII(Roads) PWD, Mapusa with designation;
(b) the details of total number of technical/non-technical staff on roll and not on roll;
(c) whether the staff on roll are with in the approved staff strength or otherwise with details; and
(d) whether the staff strength will be increased?
SUB: UNSTARRED LAQ NO. 061 TABLED BY SHRI. JOSHUA PETER DE SOUZA, REGARDING “STAFF STRENGTH AT SUB-DIV. IV WORKS DIV XIII(ROADS) PWD, MAPUSA” TO BE ANSWERED ON 22TH JULY 2022.
QUESTIONS | ANSWERS |
Will the Minister for Public Works be pleased to state: | By Shri. Nilesh Cabral, Hon’ble Minister for PWD |
(a) the details of total number of staff working under Sub-Div. IV Works Div XIII(Roads) PWD, Mapusa with designation; |
Sir, As per Annexure I |
(b) the details of total number of technical/non-technical staff on roll and not on roll; | Staff on roll is as below, Technical Staff - 3 Nos. Non Technical Staff - 6 Nos. |
(c) whether the staff on roll are with in the approved staff strength or otherwise with details; and | Yes details are as per Annexure - II |
(d) whether the staff strength will be increased? | Steps are being taken to fill the vacant post. |
Second Session 2022
BUSINESS FOR THE DAY -10
Public Works
Public Works Department
WILL the Minister for Public Works be pleased to state:
(a) the details of total number of staff working under Sub-Div. II work Div XVII (PHE) PWD, Mapusa with designation;
(b) the details of total number of technical/non-technical staff on roll and not on roll;
(c) whether the staff on roll at Mapusa are within the approved staff strength or otherwise with details; and
(d) whether the delay in repairs work, shortage of water, irregular supply of water, repairs of taps, etc. is on account of shortage of staff; and
(e) if so, the details thereof and if not, the reason therefore?
SUB: UNSTARRED LAQ NO. 062 TABLED BY SHRI. JOSHUA PETER DE SOUZA, REGARDING “STAFF STRENGTH AT SUB-DIV. II WORKDIV XVII (PHE) PWD, MAPUSA” TO BE ANSWERED ON 22TH JULY 2022.
QUESTIONS | ANSWERS |
Will the Minister for Public Works be pleased to state: | By Shri. Nilesh Cabral, Hon’ble Minister for PWD |
(a) the details of total number of staff working under Sub-Div. II work Div XVII (PHE) PWD, Mapusa with designation; | Sir, details are given in Annexure-I
|
(b) the details of total number of technical/non-technical staff on roll and not on roll; | Details are given in Annexure-II
|
(c) whether the staff on roll at Mapusa are within the approved staff strength or otherwise with details; and | Yes. Details are given in Annexure-II
|
(d) whether the delay in repairs work, shortage of water, irregular supply of water, repairs of taps, etc. is on account of shortage of staff; and | No. All complaints are attended immediately. |
(e) if so, the details thereof and if not, the reason therefore? | Not applicable in view of above. |
Second Session 2022
BUSINESS FOR THE DAY -10
Public Works
Public Works Department
63. WILL the Minister for Public Works be pleased to state:
(a) the measure taken by the Government to ensure an uninterrupted supply of water to Mapusa Constituency;
(b) whether the Government intends to lay/construct a dedicated line for supplying water; if so, the time frame by which this pipeline will be laid and made operational;
(c) whether any proposal with the Government for construction of reservoirs; the details of water reservoirs to be constructed such as estimated date of commencement construction, completion and commissioning; and the status of the tendering process and estimate along with the source of funds;
(d) the beneficiaries of the said reservoirs;
(e) the existing water connection along with the date of installation, the gauge of pipeline; and
(f) Whether the augmentation of the Assonora water treatment plant has been conducted recently to increase the water production due to the increase in demand from residential and commercial project in Bardez Taluka?
SUB: UNSTARRED LAQ NO. 063 TABLED BY SHRI. JOSHUA PETER DE SOUZA, REGARDING “UNINTERRUPTED SUPPLY OF WATER TO MAPUSA CONSTITUENCY” TO BE ANSWERED ON 22TH JULY 2022.
QUESTIONS | ANSWERS |
Will the Minister for Public Works be pleased to state: | By Shri. Nilesh Cabral, Hon’ble Minister for PWD |
(a) the measure taken by the Government to ensure an uninterrupted supply of water to Mapusa Constituency; | Sir, the water supply to Mapusa Constituency is received from Water Treatment Plant at Assonora. The demand is 20 MLD and the supply is 14 MLD. The shortfall is 6 MLD. The supply duration is 2-4 hours.The augmentation of Water Treatment Plant at Assonora is proposed to be taken up, and the same is tendered and will be taken up shortly. |
(b) whether the Government intends to lay/construct a dedicated line for supplying water; if so, the time frame by which this pipeline will be laid and made operational; | No. There is no proposal to lay a dedicated line for Mapusa Constituency. |
(c) whether any proposal with the Government for construction of reservoirs; the details of water reservoirs to be constructed such as estimated date of commencement construction, completion and commissioning; and the status of the tendering process and estimate along with the source of funds; | Yes. A GLR of 300m3 capacity is proposed to be taken up near DMC College at an estimated cost of Rs. 99.11 lakhs. The tenders for the same are opened and processed for approvals. The period of execution is 360 days after issue of work order. The said project is approved and taken up under state funds. |
(d) the beneficiaries of the said reservoirs; | The residents of Assagoa, Canca and Mapusa (around Ghatyeshwar temple) will be the beneficiaries of the said reservoir. |
(e) the existing water connection along with the date of installation, the gauge of pipeline; and | Not carried out as on date. |
(f) Whether the augmentation of the Assonora water treatment plant has been conducted recently to increase the water production due to the increase in demand from residential and commercial project in BardezTaluka? | Recently no augmentation of Assonora WTP has been carried out. |
Second Session 2022
BUSINESS FOR THE DAY -10
Public Works
Public Works Department